Mocoat was contracted to provide an 18’ wide x 50’ long x 12’ high building for use at CNRL’s Kirby site. The building was pre-assembled at Mocoat’s facility in Calgary, the taken apart, crated and shipped unassembled to site on a single flat deck trailer. By shipping unassembled, the client was able to avoid large shipping costs by avoiding utility lifting and pilot cars.

Once the panels arrived on site, Mocoat sent a construction supervisor to oversee an on-site construction crew and assemble the building with ease.