FRP/Mocoat was contracted to provide a 16’ wide x 62’ long x 12’ high building for Conoco Phillips Montney. The building too long to ship on a single trailer so it was built in two halves and shipped to site as two pieces. Upon arriving on site, the building halves were easily bolted together, sealed and placed upon pre-installed piles.
The building was fully turn-key once arriving on site. Three catadyne heaters were pre-installed in the building. The gas lines were hooked up with a simple flanged connection on the outside of the building that allowed the site to connect their fuel easily.
Temporary wood bracing was installed to help avoid damages during shipping.